Fill This Form To Receive Instant Help

Help in Homework
trustpilot ratings
google ratings


Homework answers / question archive / Project Assignment 1: Work Breakdown Structure (WBS) (individual) 10 points This assignment should be at least 7 pages and at most 10 pages (including a WBS graphic with explanation and list of references), 1

Project Assignment 1: Work Breakdown Structure (WBS) (individual) 10 points This assignment should be at least 7 pages and at most 10 pages (including a WBS graphic with explanation and list of references), 1

Project Management

Project Assignment 1: Work Breakdown Structure (WBS) (individual) 10 points This assignment should be at least 7 pages and at most 10 pages (including a WBS graphic with explanation and list of references), 1.5 spacing and 12 font. You need a cover sheet or front matter. The cover sheet/front matter and list of references do NOT count toward the page count. 1. Explain the project background 2. Explain the project objective 3. In Innoslate, input the top 5 system requirements that drive the project? In the rationale for the requirement explain why this is an important system requirement. Create a requirement report document from Innoslate to include in your submission. 4. Explain the scope of the project. Include project assumptions and constraints. 5. Who are the stakeholders and what are their needs? How will you manage them? 6. In Innoslate using an action or activity diagram hierachy, develop a draft WBS for the Segway project. In your description of the WBS, explain: • What are the key deliverables? • What is the scope • What are the technical and program requirements? • Provide some more fidelity in the actual work of modifying the Segways ie detailed design tasks for the components that require modification; production or manufacture or modification and integration tasks that translate the detail designs into a product. Discuss if you will apply learning curves (see B&F chapter 16 and Kerzner p 456 and chapter 18). Tasks should ensure that you combine all the individual components into an integrated system

Purchase A New Answer

Custom new solution created by our subject matter experts

GET A QUOTE