Trico Company set the following standard unit costs for its single product.
Direct materials (30 Ibs. @ $5.10 per Ib.) $ 153.00
Direct labor (8 hrs. @ $14 per hr.) 112.00
Factory overhead—Variable (8 hrs. @ $6 per hr.) 48.00
Factory overhead—Fixed (8 hrs. @ $12 per hr.) 96.00
Total standard cost $ 409.00
The predetermined overhead rate is based on a planned operating volume of 80% of the productive capacity of 52,000 units per quarter. The following flexible budget information is available.
Operating Levels 70% 80% 90%
Production in units 36,400 41,600 46,800
Standard direct labor hours 291,200 332,800 374,400
Budgeted overhead
Fixed factory overhead $ 3,993,600 $ 3,993,600 $ 3,993,600
Variable factory overhead $ 1,747,200 $ 1,996,800 $ 2,246,400
During the current quarter, the company operated at 90% of capacity and produced 46,800 units of product; actual direct labor totaled 370,400 hours. Units produced were assigned the following standard costs.
Direct materials (1,404,000 Ibs. @ $5.10 per Ib.) $ 7,160,400
Direct labor (374,400 hrs. @ $14 per hr.) 5,241,600
Factory overhead (374,400 hrs. @ $18 per hr.) 6,739,200
Total standard cost $ 19,141,200
Actual costs incurred during the current quarter follow.
Direct materials (1,385,000 Ibs. @ $6.70 per lb.) $ 9,279,500
Direct labor (370,400 hrs. @ $11.50 per hr.) 4,259,600
Fixed factory overhead costs 3,196,600
Variable factory overhead costs 3,016,800
Total actual costs $ 19,752,500
Problem 08-4A Computing materials, labor, and overhead variances LO P3, P4
Required:
1) Compute the direct materials cost variance, including its price and quantity variances.
2) Compute the direct labor cost variance, including its rate and efficiency variances.
3) Compute the overhead controllable and volume variances.