Fill This Form To Receive Instant Help

Help in Homework
trustpilot ratings
google ratings


Homework answers / question archive / As-Is Process Flow Chart Evaluation Create a new Word doc to use for the elements of this assignment

As-Is Process Flow Chart Evaluation Create a new Word doc to use for the elements of this assignment

Business

As-Is Process Flow Chart Evaluation

Create a new Word doc to use for the elements of this assignment.

 Select a process from an organization you work for or are familiar with. You will use this process in your assessments for Competency 2 and 3 as well.

Create a flowchart of the as-is process using Microsoft Word, PowerPoint, Vizio, or Excel. Insert the flow chart in your Word doc with the header "As-Is Process Flow Chart Evaluation."

Under the flow chart in your Word doc, write an evaluation of the efficacy of your process using process improvement techniques.

Process Improvement Flow Chart

Determine how the process can be improved based on the results of your evaluation.

Define metrics and measure the current process. Add the metrics and measures to your Word doc.

Use process improvement techniques to improve the process. Create a flow chart of the improved process using Microsoft Word, PowerPoint, Vizio, or Excel. Use your professional judgment to ascertain how the future process will perform according to your metrics. 

Insert your new flow chart on your Word doc under the header "Process Improvement Flow Chart."

Continue to Step 3: Executive Summary

.Executive Summary

Write a 525-word executive summary on your Word doc under the header "Executive Summary." Include the following in your summary:

  • A brief description of the process based on the flowchart of processes current state
  • The results of your process evaluation and how the weak points can be strengthened. Include a description of the process improvement technique(s) used.
  • A brief description of process improvements based on the process of the future state
  • How you anticipate the future process will perform based on metrics used to evaluate process current state
  • A description of your process improvement project to achieve the process future state

Cite references to support your assignment.

Format your citations according to APA guidelines.

Continue to Part B: Statistical Process Control Methods.

OPSCB/574 Competency 1 Assessment and Rubric Course Title: Creating Value Through Operations Competency Assessment Title: Statistical Process Control Methods Total Number of Points: 100 Assignment Directions Step 1: Process Evaluation Create a new Word doc for the elements of this assignment. Evaluate your process using 1 of the following: • • Use the lean concept to find ways to eliminate waste and improve the process. Use SPC or Six Sigma to reduce defects or variances in the process. Add your evaluation to your Word doc with the header "Process Evaluation." Step 2: Evaluation of Control Chart and Process Metrics Complete the following in Excel: • • • Calculate the defined process metrics including variation and process capability. Develop and display a control chart for the process. Evaluate the control chart and process metrics using Statistical Process Control (SPC) methods. Determine whether the process could benefit from the use of Six Sigma, Lean, or other tools. (Include all calculation and charts.) Write your evaluation in your assignment Word doc under the header "Evaluation of Control Chart and Process Metrics." OPSCB/574 Competency 1 Rubric Step 3: Executive Summary Write a 700-word executive summary that includes the following: • • • • A summary of the Process Evaluation (using either Lean or SPC or Six Sigma) A summary of the Evaluation of Control Chart and Process metrics based on SPC methods A summary of your evaluation of whether the process would benefit from the use of Six Sigma, Lean, or other tools A description of the SPC project and recommendations for improvements Add your summary to your Word doc with the header, "Executive Summary." Page 2 of 3 OPSCB/574 Competency 1 Rubric Page 3 of 3 Competency Assessment Rubric Assignment/Performance Criteria 1. Evaluation of the process Mastery 100% Thoroughly evaluated the process. Meets Expectations 85% Partially evaluated the process. (weight 20%) 2. Evaluation of the control chart and process metrics using the statistical process control methods Partially evaluated the control chart and process metrics using statistical process control methods. Thoroughly developed a summary of the process evaluation. Partially developed a summary of the process evaluation. Thoroughly developed a summary of the evaluation of control chart and process metrics based on SPC methods. Partially developed a summary of the evaluation of control chart and process metrics based on SPC methods. Narrowly developed a summary of the evaluation of control chart and process metrics based on SPC methods or did not submit a summary of the process evaluation. Thoroughly developed a summary of the evaluation of whether the process would benefit from the use of Six Sigma, Lean, or other tools. Partially developed a summary of the evaluation of whether the process would benefit from the use of Six Sigma, Lean, or other tools. Narrowly developed a summary of the evaluation of whether the process would benefit from the use of Six Sigma, Lean, or other tools or did not submit a summary of the evaluation of whether the process would benefit from the use of Six Sigma, Lean, or other tools Provided a detailed description of the SPC project. Provided a partial description of the SPC project. Provided detailed recommendations for improvements. Provided partial recommendations for improvements. (weight 10%) 4. Summary of control chart and process metrics based on SPC methods (weight 10%) 5. Six Sigma, Lean, or other tools evaluation summary (weight 10%) 6. Description of the Statistical Process Control (SPC) project (weight 15%) 7. Recommendations for improvement (weight 15%) Narrowly evaluated the process or did not submit evaluation of process. Thoroughly evaluated the control chart and process metrics using statistical process control methods. (weight 20%) 3. Process evaluation summary Not Met 0% Narrowly evaluated the control chart and process metrics using statistical process control methods or did not submit evaluation of the control chart and process metrics using statistical process control methods. Narrowly developed a summary of the process evaluation or did not submit a summary of the process evaluation. Provided a narrow description of the SPC project or did not provide a description of the SPC project. Provided vague recommendations for improvements or did not provide recommendations for improvements.

Option 1

Low Cost Option
Download this past answer in few clicks

19.89 USD

PURCHASE SOLUTION

Already member?


Option 2

Custom new solution created by our subject matter experts

GET A QUOTE

Related Questions