Manage Internal WSH Management System Audit (WP02-CA-503C-1) Assessment Plan
Annex D Written Assignment
Manage Internal WSH Management System Audit
Written Assignment (WA)
Instructions to candidate:
Copyright © 201 |
4 |
|
NTUC LearningHub Pte Ltd. All rights reserved. |
|
53 |
|
|
WA1. Audit plan
WA2. On-site audit schedule
WA3. Audit protocol
WA4. Audit report
WA5. Follow up action plan*
* this can be part of the audit report or a standalone document
CASE STUDY
You are nominated as the Lead Auditor to plan and conduct a full WSH management system internal audit for your company, Titan Machinery Workshop Pte Ltd.
The Titan Manufacturing Pte Ltd is located at 22, Titan Road, Singapore 123456. It is a factory specializing at servicing and repairing machinery parts. It has a total headcount of 20 persons, with the following organizational structure:
At the main workshop, operators use hand tools such as hammer, saw and plyer as well as chemicals such as turpentine and lubricant oil in their course of work. At the smaller workshop, operators use grinder, driller and other power tools to fabricate and mold steel rods and steel plates. Other facilities in the workshop include a paint booth, a waste storage area and an office.
As a lead auditor, you will prepare an audit plan (WA1) and an on-site audit schedule (WA2). You have decided that the auditor team for this WSH management system internal audit will make up of two (2) persons (including yourself). The on-site audit for the entire premise will take one (1) working day.
You will be presenting the audit plan and the on-site audit schedule to a panel of stakeholders during the oral questioning on the day of assessment.
You are provided with some documentation of the organization's WSH management system:
Based on the above documentation, develop a WSH internal audit protocol (WA3). Your internal audit protocol should include the legislative requirements.
Your internal audit protocol should focus on the main workshop. You have made arrangement to have the following auditees to be available at the main workshop on the day of on-site audit:
Your audit checklist should comprise three key components:
Your internal audit protocol should be about one page, but not more than two pages.
You will also prepare an internal audit report (WA4) for the audit. Your internal audit report should include key findings and recommendations for corrective and preventive actions. You may make up the audit evidences, for the purpose of completing your audit checklist and audit report.
You may be asked, during the oral questioning, to demonstrate your audit trail techniques in arriving at the key findings in the audit report.
Reminder: Candidate must have one (1) set of hard copy of the written assignments ready on the day of assessment. All written assignments must be submitted to the assessor at the conclusion of the assessment. The written assignments are:
WA1: Audit Plan WA2: On-site Audit Schedule WA3: Audit Protocol WA4: Audit Report WA5: Follow-Up Action Plan* *this can be part of the audit report or a standalone document
|
Annex E WSH Management System Documentation
Titan Machinery Workshop Pte Ltd
WSH Management System Documentation
Titan Machinery Workshop Pte Ltd |
Doc. No: |
SP-001 |
System Procedure Title: Hazard Identification, Risk Assessment and Determining Controls
|
Version: Issue date: |
002 01-01-2013 |
Page: |
4 (total) |
S/No. |
Rev No |
Date of Issue |
Description of Amendment for Preceding Version |
1 |
001 |
01/06/2010 |
New issue |
2 |
002 |
01/01/2013 |
Reviewed, and there is no amendment. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Prepared by Achiban (Management Representative) |
Achiban |
|
Date 01/01/2013 |
|||
|
|
|
|
|
Approved By Soloman (Director) |
Solomon |
|
|
|
|
Date 01/01/2013 |
|
|
|
|
This SP outlines the procedures for hazard identification, risk assessment and determination of necessary controls.
2. SCOPE
This SP is applicable to all functions and operations in Titan premise.
3.1 Hazards identification, risk assessment, and determination of necessary controls shall be conducted for all activities, including both day-to-day activities and those conducted only periodically or on an ad-hoc basis.
3.2 In addition to the activities that are carried out by Titan personnel, hazards and risks arising from the activities of contractors and visitors, as well as those arising from the use of products and services supplied by vendors shall also be identified.
3.3 When conducting hazard identification and risk assessment, the supervisor shall take into account:
Hazards can be identified by consulting with those involved with the work, observing work practices, reviewing incident and injury reports, reading labels and literature, etc. One may break down operations or activities into specific basic tasks or steps with distinct objective or equipment usage before attempting to identify the hazards associated with each task within.
A risk is simply a measure of the likelihood that a hazard will cause harm or injury to a person. Once hazards have been identified, an assessment should be made to determine the severity and probability of accidents or incidents that may arise from these hazards.
Severity may be classified into the following levels with escalating consequences:
Likelihood (or Probability) may be classified as being:
Table below shows the matrix to illustrate the product of the two parameters (Risk = Severity X Likelihood).
Likelihood |
|
Severity |
Very likely |
(3) |
|
Possible |
|
(2) |
Unlikely |
(1) |
|
Low |
(1) |
|
|
3 |
|
2 |
1 |
|
Medium |
(2) |
|
6 |
|
|
4 |
|
2 |
High |
|
(3) |
|
9 |
|
6 |
|
3 |
Risk |
Decision Process |
<3 |
Risk Acceptable |
3,4 |
Consider appropriate risk control measure/s |
>4 |
Risk control measure/s a requirement |
3.7 When determining controls, or considering changes to existing controls, consideration shall be given to reducing the risks according to the following hierarchy:
3.8 Evaluate and Review
Evaluate to check that the risk controls have been properly established, cost effective and that they are effective in controlling the risk. Re-assess the risks on the basis of the revised controls to verify that risks have been reduced to a tolerable level and that no new hazards have been created as result of the implemented control measures.
3.9 Review the assessment whenever there has been an incident or a significant change to the job e.g., new equipment, substances, people, procedures which may affect the existing risks. Even if there are no changes, the risk assessment should be reviewed, and if necessary, revised at least once every 3 years.
Manage Internal WSH Management System Audit (WP02-CA-503C-1) Assessment Plan
|
|
Activity-Based Risk Assessment Form |
|
|||||||||||||||
|
RA Reference Number: RA001
|
RA Lead: Julian (supervisor)
Approved by (Name, Designation, Date, Signature): Achiban (Management Representative), 06/06/2013 |
First Assessment Date: 1/6/2010 |
|||||||||||||||
Last Review Date: 1/1/2013 |
||||||||||||||||||
Next Review Date: 1/1/2016 |
||||||||||||||||||
|
||||||||||||||||||
|
Hazard Identification |
|
Risk Evaluation |
|
Risk Control |
|||||||||||||
No |
Description/ Details of Steps in Activity |
Hazards |
Possible Accident / Ill Health |
Existing Risk Control |
Severity |
Likelihood |
Risk Level |
Additional Risk Control |
Person to implement additional control |
Due Date |
||||||||
1 |
Storage of articles on rack |
Falling articles from the rack |
Cut, bruises, fractures |
Wear safety boots in workshop. Proper stacking of items on rack. No loose items on the rack. |
2 |
1 |
2 |
|
|
|
||||||||
|
|
Personnel falling from height when accessing the top tier of the rack |
Sprain, bruises |
Nil. |
2 |
3 |
6 |
Purchase and use a stool/ ladder |
Workshop supervisor |
31/07/2013 |
||||||||
|
|
Manual handling of articles |
Strains and sprains |
Use proper lifting techniques, seek help if the load is bulky. |
1 |
1 |
1 |
|
|
|
||||||||
|
|
Manual handling of sharp articles |
Cuts |
Use proper lifting techniques, seek help if the load is bulky. Wear gloves. |
2 |
1 |
2 |
|
|
|
||||||||
|
|
Slip, trip and fall |
Sprain, bruises |
Keep storage area free from liquid, or loose materials. |
2 |
1 |
2 |
|
|
|
||||||||
2 |
Storage of chemicals |
Spillage or leakage of chemical |
Irritation to skin and eyes |
Clean up using rags. |
2 |
1 |
2 |
Purchase chemical spill kit. Ensure operators to be trained in chemical safety. |
Workshop supervisor |
31/07/2013 |
||||||||
|
|
Flammable liquids |
Fire |
Keep container tightly closed. Store in a well-ventilated place. |
3 |
1 |
3 |
Ensure operators to be trained in chemical safety. |
Workshop supervisor |
31/07/2013 |
||||||||
3 |
Handling of chemicals |
Irritant liquids |
Skin irritation |
Use gloves. |
1 |
1 |
1 |
|
|
|
||||||||
4 |
Use of hand tools |
Contact with sharp edges |
Cut |
Inspect tools for damages before use. Keep tools on the tool board |
2 |
1 |
2 |
|
|
|
Copyright © 2014 NTUC LearningHub Pte Ltd. All rights reserved. 61
LHUB_ver1.0
Titan Machinery Workshop Pte Ltd |
Doc. No: |
SP-003 |
System Procedure
Title: Competence, Training and Awareness
|
Version: Issue date: |
002 01-01-2013 |
Page: |
3 (total) |
S/No. |
Rev No |
Date of Issue |
Description of Amendment for Preceding Version |
1 |
001 |
01/06/2010 |
New issue |
2 |
002 |
01/01/2013 |
Supervisors will conduct internal training on proper lifting technique for their staff. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Prepared by Achiban (Management Representative) |
Achiban |
||
Date 01/01/2013 |
|||
|
|
||
Approved By Soloman (Director) |
Solomon |
||
|
|
|
Date 01/01/2013 |
|
|
|
|
This SP outlines the procedures for:
This is to ensure that persons are competent and have the necessary education, training and experience to perform works in a safe manner.
This SP is applicable to all persons under the control of Titan that perform tasks that can impact on OH&S.
The supervisors are to ensure that persons, whose work may impact OH&S, are competent on the basis of appropriate education, training or experience. Such educational, training and experience background of each member should be recorded and regularly updated.
Training needs may be identified as part of:
The identified training needs shall be recorded in the Training Need Analysis form.
The MR shall prepare the annual training plan. The plan shall be updated / adjusted as and when required.
The training plan shall be approved by the Director.
Irrespective of job-specific training, all persons shall be trained on general OH&S issues which shall cover but not limited to the following:
Consideration should be given to the differing levels of responsibility, ability, language skills and literacy as well as the significance of risk exposed to.
Supervisor will provide job-specific training to persons performing tasks associated to significant risks.
Where necessary, re-training sessions may be conducted as a result of:
The MR shall maintain the training plan and training needs analysis records. The supervisors shall maintain the staff training records.
Manage Internal WSH Management System Audit (WP02-CA-503C-1) Assessment Plan
Training Course |
Organizer |
|
|
|
|
|
2012 - Month |
|
|
|
|
|
|
Jan |
Feb |
Mar |
Apr |
May |
Jun |
Jul |
Aug |
Sept |
Oct |
Nov |
Dec |
||
OH&S management system |
External |
|
|
x |
|
|
|
|
|
|
|
|
|
Risk assessment |
External |
|
|
x |
|
|
|
|
|
|
|
|
|
OH&SMS internal audit |
External |
|
|
x |
|
|
|
|
|
|
|
|
|
Proper lifting techniques |
External |
|
|
x |
|
|
|
|
|
|
|
|
|
General safety |
External |
x |
|
|
|
|
x |
|
|
|
|
|
|
Copyright © 2014 NTUC LearningHub Pte Ltd. All rights reserved. 65
LHUB_ver1.0
Manage Internal WSH Management System Audit (WP02-CA-503C-1) Assessment Plan
Training Course |
Organizer |
|
|
|
|
|
2013 - Month |
|
|
|
|
|
|
Jan |
Feb |
Mar |
Apr |
May |
Jun |
Jul |
Aug |
Sept |
Oct |
Nov |
Dec |
||
OH&S management system |
External |
|
|
x |
|
|
|
|
|
|
|
|
|
Risk assessment |
External |
|
|
x |
|
|
|
|
|
|
|
|
|
OH&SMS internal audit |
External |
|
|
|
|
|
|
|
|
|
x |
|
|
Proper lifting techniques |
Internal* |
|
|
|
|
|
|
|
|
|
|
|
|
General safety |
External |
x |
|
|
|
|
x |
|
|
|
|
|
|
*Within 3 months from the commencement of hiring.
Copyright © 2014 NTUC LearningHub Pte Ltd. All rights reserved. 66
LHUB_ver1.0
Titan Machinery Workshop Pte Ltd |
Doc. No: |
OP-003 |
Operational Procedures
Title: Workshop Safety
|
Version: Issue date: |
001 01-06-2010 |
Page: |
670 |
S/No. |
Rev No |
Date of Issue |
Description of Amendment for Preceding Version |
1 |
001 |
01/06/2010 |
New issue |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Prepared by Julian (Supervisor) |
Julian |
|
Date 01/06/2010 |
|||
|
|
|
|
|
Approved By Achiban (Management Representative) |
Achiban |
|
Date 01/06/2010 |
|||
|
|
|
|
This OP outlines the safety precautions to take in the workshop.
This SP is applicable to all persons working in the workshop.
Source: WSHAC (2008), Workplace Safety & Health Guidelines: service allied to the transport of goods
3.4 Inspection
3.6 Records
• The Supervisor shall maintain the SDS, chemical inventory list, equipment list and inspection records