Homework answers / question archive / 1)Which of the following are purposes of the Defense Acquisition System?  Develop technology Produce weapons system Provide logistics support Validate requirements   2

1)Which of the following are purposes of the Defense Acquisition System?  Develop technology Produce weapons system Provide logistics support Validate requirements   2

Business

1)Which of the following are purposes of the Defense Acquisition System? 

  • Develop technology
  • Produce weapons system
  • Provide logistics support
  • Validate requirements

 

2. Documents produced during the JCIDS process are used to support Defense Acquisition System milestone decisions.

  • True
  • False

 

3. Which of the following are characteristics of the Materiel Solution Analysis phase? (Select all that apply)

  • Promising technologies are analyzed to determine which one is best suited to meet validated requirements
  • A PM is selected and a program office is established.
  • The phase takes place after Milestone A decision.
  • The AoA is conducted.

 

4. The results of the AoA provide the basis for which of the following?

  • Acquisition Strategy
  • Materiel Solution Analysis
  • Materiel Development Decision
  • Initial Capabilities Document

 

5. Which one of the following is considered a primary goal of an Acquisition Strategy?

  • Minimize the time and cost needed to satisfy validated needs
  • Ensure the lowest initial cost for procuring products
  • Identify a viable product disposal strategy
  • Identify solutions to identified capability gaps

 

6. The AS must be approved by the MDA prior to what?

  • The MDD
  • The ICD
  • The AoA
  • Release of a formal solicitation

 

7. Which term is defined as the minimum acceptable value for performance that is necessary to satisfy an identified need?

  • Objective
  • Threshold
  • Quality
  • Performance

 

 

 

8. Which of the following are considered parameters of the Acquisition Program Baseline? (Select all that apply)

  • Quality
  • Cost
  • Schedule
  • Performance

 

9. A successful Milestone A decision leads to entry into which phase?

  • Engineering and Manufacturing Development
  • Milestone B
  • Production and Deployment
  • Technology Maturation and Risk Reduction

 

10. The MDA must approve which of the following for a program to successfully complete Milestone A? (Select all that apply)

  • The proposed materiel solution
  • The Acquisition Strategy
  • A validated Capabilities Product Document
  • A Life Cycle Sustainment Plan

 

11. When does a program enter the TMRR phase?

  • When the ICD has been completed and the MDA has approved the AS
  • When the CDD has been completed and the MDA has approved the AS
  • When the CPD has been completed and the MDA has approved the AS
  • When the AoA has been completed and the MDA has approved the AS

 

12. Which of the following are goals of the TMRR phase?
(Select all that apply)

  • Reduce technology risk
  • Ensure the lowest possible cost
  • Demonstrate critical technologies through prototyping
  • Conduct a preliminary design review

 

13. True or false? One of the requirements for a project to exit the TMRR phase is that the technology has been demonstrated in a relevant environment.

  • True
  • False

 

14. What is the purpose of Milestone B?

  • Initiates production and deployment phase
  • Initiates engineering and manufacturing development phase
  • Initiates technology maturation and risk reduction phase
  • Initiates a new acquisition program phase

 

 

 

15. Which of the following are key considerations of the EMD phase?(Select all that apply)

  • Completes all needed hardware and software detailed design
  • Systemically retires any open risks
  • Prepares for production and deployment
  • Develops exit criteria for LRIP or limited deployment

 

16. Which of the following is a responsibility of the PM during the EMD phase?

  • Finalizing designs of the product support elements
  • Creating manpower estimates
  • Demonstrating compliance with the DoD Strategic Plan
  • Establishing an initial production base for the system

 

 