Sheffield Co. purchased land as a factory site for $592,000. The process of tearing down two old buildings on the site and constructing the factory required 6 months.

 

The company paid $62,160 to raze the old buildings and sold salvaged lumber and brick for $9,324. Legal fees of $2,738 were paid for title investigation and drawing the purchase contract. Sheffield paid $3,256 to an engineering firm for a land survey, and $100,640 for drawing the factory plans. The land survey had to be made before definitive plans could be drawn. Title insurance on the property cost $2,220, and a liability insurance premium paid during construction was $1,332. The contractor's charge for construction was $4,055,200. The company paid the contractor in two installments: $1,776,000 at the end of 3 months and $2,279,200 upon completion. Interest costs of $251,600 were incurred to finance the construction.

 

Determine the cost of the land and the cost of the building as they should be recorded on the books of Sheffield Co. Assume that the land survey was for the building.

What is the Cost of the Land?

What is the cost of the building?

Option 1

Low Cost Option
Download this past answer in few clicks

2.94 USD

PURCHASE SOLUTION

Already member?


Option 2

Custom new solution created by our subject matter experts

GET A QUOTE