A factory wants the power company to run a special line to the plant

Math Oct 01, 2020

A factory wants the power company to run a special line to the plant. The power company is located 1000 meters down a river on the opposite bank. Ground lines cost $20 per meter. The river is 500 meters wide and underwater line will cost M (M> 1) times as much per meter as the above ground line. Since the factory owns the riverfront property on both sides of the river all the way to the power plant, you may choose where and how the line should cross the river.

1- Find in terms of M all paths that will minimize the cost and what the minimum cost is. Be sure to describe your paths clearly. See diagram.
2- If M =50 give the minimum cost and the best path.
3- If M =2 give the minimum cost and the best path.
4- If M =1.05 give the minimum cost and the best path.

Expert Solution

please see the attached file.

Archived Solution
Unlocked Solution

You have full access to this solution. To save a copy with all formatting and attachments, use the button below.

Already a member? Sign In
Important Note: This solution is from our archive and has been purchased by others. Submitting it as-is may trigger plagiarism detection. Use it for reference only.

For ready-to-submit work, please order a fresh solution below.

Or get 100% fresh solution
Get Custom Quote
Secure Payment