Hickory Company manufactures two products—13,000 units of Product Y and 5,000 units of Product Z

Accounting

Hickory Company manufactures two products—13,000 units of Product Y and 5,000 units of Product Z. The company uses a plantwide overhead rate based on direct labour-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z:

 

  Activity Measure Estimated Overhead Cost Expected Activity
Machining Machine-hours $ 231,600   12,000 MH
Machine setups Number of setups $ 55,900   130 setups
Product design Number of products $ 77,000   2 products
General factory Direct labour-hours $ 364,500   14,400 DLHs
 

 

Activity Measure Product Y Product Z
Machine-hours   6,300     5,700  
Number of setups   40     90  
Number of products   1     1  
Direct labour-hours   9,000     5,400  
 

1- What is the company's plantwide overhead rate?

2- Using the plantwide overhead rate, how much manufacturing overhead cost is allocated to Product Y and Product Z?

3-What is the activity rate for the Machining activity cost pool?

4- What is the activity rate for the Machine Setups activity cost pool?

5-What is the activity rate for the Product Design activity cost pool?

6- What is the activity rate for the General Factory activity cost pool?

7- Which of the four activities is a batch-level activity?

multiple choice

Machine setups activity

General factory activity

Product design activity

Machining activity

 

8- Which of the four activities is a product-level activity?

multiple choice

Machining activity

Product design activity

General factory activity

Machine setups activity

 

9- Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Y?

10- Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Z?