Homework answers / question archive / University of Houston CNST 4345 Quiz review Quiz 1 1)Based on the data presented in this class, what is the typical percentage of total workhours expended for reinforced concrete work in a grass roots heavy industrial project? Based on last week’s class notes, what kind of reinforced concrete elements are we talking about? Typically, review and approval of detailed formwork design is the responsibility of the Design Professional

University of Houston CNST 4345 Quiz review Quiz 1 1)Based on the data presented in this class, what is the typical percentage of total workhours expended for reinforced concrete work in a grass roots heavy industrial project? Based on last week’s class notes, what kind of reinforced concrete elements are we talking about? Typically, review and approval of detailed formwork design is the responsibility of the Design Professional

Business

University of Houston

CNST 4345

Quiz review Quiz 1

1)Based on the data presented in this class, what is the typical percentage of total workhours expended for reinforced concrete work in a grass roots heavy industrial project?

  1. Based on last week’s class notes, what kind of reinforced concrete elements are we talking about?
  2. Typically, review and approval of detailed formwork design is the responsibility of the Design Professional.
  3. Typically, the Design Professional should review and approve the concrete mixture proportions (mix design) and submittals concerning materials, procedures, and testing data.
  4. The procedure for final acceptance of the project must be clearly defined in the:
  5. After award of the contract, the Construction and any Specialty Contractors should meet with

the Owner to review design requirements and criteria for the shop drawings, samples, or submittals.

  1.                          are the critical elements for a successful project regarding clearly delineated and efficient office procedures for the administration of design, document control, checking of shop or placing drawings, and processing design changes.
  2. Pre-bid and preconstruction conferences should be held to identify
  3. Which subject category in the Level I (AC) Examination are weighted about 14%?

 

Option 1

Low Cost Option
Download this past answer in few clicks

2.83 USD

PURCHASE SOLUTION

Already member?


Option 2

Custom new solution created by our subject matter experts

GET A QUOTE