Trusted by Students Everywhere
Why Choose Us?
0% AI Guarantee

Human-written only.

24/7 Support

Anytime, anywhere.

Plagiarism Free

100% Original.

Expert Tutors

Masters & PhDs.

100% Confidential

Your privacy matters.

On-Time Delivery

Never miss a deadline.

An oil refinery is located on the north bank of a straight river that is 2 km2 km wide

Accounting Dec 08, 2020

An oil refinery is located on the north bank of a straight river that is 2 km2 km wide. A pipeline is to be constructed from the refinery to storage tanks located on the south bank of the river 6 km6 km east of the refinery. The cost of laying pipe is $400,000/km$400,000/km over land and $800,000/km$800,000/km under the river to the tanks. What is the minimum cost to lay the pipeline?

Expert Solution

The expression for length from point P to storage tank is,

l1=√22+P2=√4+P2l1=22+P2=4+P2

 

The expression for the length of the refinery to the point P is,

l2=6?Pl2=6?P

 

The cost of the pipe on the land is,

Cs=cs×l2Cs=cs×l2

 

Substitute the given values.

Cs=400000×(6−P)Cs=400000×(6−P)

 

The cost of the pipe in the water is,

CW=cW×l2CW=cW×l2

 

Substitute the given values.

Cs=800000×√4+P2Cs=800000×4+P2

 

The expression for the total cost is,

TC=400000×(6−P)+800000×√4+P2TC=400000×(6−P)+800000×4+P2

 

Differentiate the above function and equate to zero for the maximum value of P is,

−400000+12×800000(4+P2)−1/2⋅2P=0√4+P2=2P4+P2=4P2P2=43P=2√3=1.154−400000+12×800000(4+P2)−1/2⋅2P=04+P2=2P4+P2=4P2P2=43P=23=1.154

 

Substitute the given values.

TC=400000×(6−2√3)+800000×√4+43=$2540341.184TC=400000×(6−23)+800000×4+43=$2540341.184

 

Thus the minimum cost to lay the pipeline is $2540341.184$2540341.184.

Total Cost

The total cost of the company can be of two types fixed coat and variable value. All those costs which require one time at the time of initializing the organization are termed as a fixed cost, and that cost which varies with time is a variable.

Archived Solution
Unlocked Solution

You have full access to this solution. To save a copy with all formatting and attachments, use the button below.

Already a member? Sign In
Important Note: This solution is from our archive and has been purchased by others. Submitting it as-is may trigger plagiarism detection. Use it for reference only.

For ready-to-submit work, please order a fresh solution below.

Or get 100% fresh solution
Get Custom Quote
Secure Payment