Question 1) What is a Run Chart? A chart that shows how things operate over time in a group setting

Business

Question 1)

What is a Run Chart?

A chart that shows how things operate over time in a group setting.

A quality control chart used in determining whether the long-run average of a process is changing.

A type of tool used to analyze data.

All of the above.

2.

Question 2

A Run Chart shows data in a static view.

 

True

 

False

 

Question 3

 

The mean (average) of the data points is graphically part of a Run Chart.

 

True

 

False

 

Question 4

 

What is a Control Chart?

 

The exact same thing as a Run Chart.

 

Basically, a Run Chart with additional things such as the mean (average), an upper control limit, and a lower control limit.

 

A quality control tool.

 

Both B and C.

 

Question 5

 

The upper control limit and the lower control limit are calculated mathematically.

 

True

 

False

 

Question 6

 

In a Control Chart, data points are expected to remain within the upper and lower control limit.

 

True

 

False

 

Question 7

 

An "out of control" data point is normal and expected.

 

True

 

False

 

Question 8

 

How many types of variation are there in a control chart?

 

2

3

4

None

Question 9

Prepare for the change, manage the change, and reinforce the change are all steps in a certain type of change management process.

True

False

Question 10

Which of the following describe a minor change?

Can be implemented as the result of a decision or a change order.

Any change that only affects a small part of what is planned or is being done.

All of the above.

None of the above.