Julio Manufacturing Company uses activity-based costing
Julio Manufacturing Company uses activity-based costing. The factory overhead budget for the coming period is $500,000,consisting of the following cost Pools: Direct labor support- $150,000, Machine support - $200,000, Machine setups - $100,000, Design changes - $ 50,000. The potential allocation bases and their estimated amounts were as follows: Number of design changes - 50, Number of setups- 200, Machine hours - 10,000, Direct labor hours - 20,000. Required:1. Determine the overhead rate for each cost pool, using the most appropriate allocation base for each pool. 2. Job 2525 required $25,000 for direct materials, $10,000 for direct labor, 500 direct labor hours, 1,000 machine hours, five setups, and three design changes. Determine the cost of Job2525.
Expert Solution
| 1) Computation of Overhead Rate for Each Cost Pool: | ||||
| Cost Pool | Budgeted Amount | Allocation Base | Overhead Rate | |
| Direct Labor Support | 150000 | 20000 | 7.5 | per DLH |
| Machine Support | 200000 | 10000 | 20.0 | per MH |
| Machine Setups | 100000 | 200 | 500.0 | per Setup |
| Design Changes | 50000 | 50 | 1000.0 | per number of design change |
| 2) Computation of Cost of Job 2525: | |
| Direct Material | 25000 |
| Direct Labor | 10000 |
| Direct Labor Support (500*7.5) | 3750 |
| Machine Support (1000*20) | 20000 |
| Machine Setup (500*5) | 2500 |
| Design Changes (3*1000) | 3000 |
| Total Cost of Job 2525 | 64250 |