University of California, Los Angeles RQMCMB 2 Quiz 3 1)An MRP system whose records are updated continuously is referred to as a(n): An operations strategy for inventory management should work towards: An operations strategy which recognizes high carrying costs and reduces ordering costs will result in: At which point does crashing of a project cease? disaggregated, what will the weekly forecast for version A be (assume 52 weeks per year)? Comparing known and expected capacity requirements with projected capacity availability is the job of
University of California, Los Angeles
RQMCMB 2
Quiz 3
1)An MRP system whose records are updated continuously is referred to as a(n):
- An operations strategy for inventory management should work towards:
- An operations strategy which recognizes high carrying costs and reduces ordering costs will result in:
- At which point does crashing of a project cease?
- disaggregated, what will the weekly forecast for version A be (assume 52 weeks per year)?
- Comparing known and expected capacity requirements with projected capacity availability is the job of .
- activity 1011 (far right hand side), if the earliest start time of 810 (upper left hand side) is 12, and the earliest start time of 910 (lower left hand side) is 13?
- Cycle stock inventory is intended to deal with .
- Daily usage is exactly 60 gallons per day. Lead time is normally distributed with a mean of 10 days and a standard deviation of 2 days. What is the standard deviation of demand during lead time?
- Dairy items, fresh fruit and newspapers are items that:
- ERP implementation probably won't require:
- ERP's primary value comes from applications .
- Essentially, the output of aggregate planning is the:
- Gantt charts are most closely associated with
- Given the same demand, setup/ordering costs, and carrying costs, the EOQ calculated using incremental replenishment will be if instantaneous replenishment was assumed:
- Given this information about activity 34: ES = 10, EF = 15, LS = 16, and LF = 21, we can determine that the amount of slack associated with the activity is:
- If a process is performing as it should, it is still possible to obtain observations which are outside of which limits?(I) tolerances(II) control limits(III) process variability
- If an activity is determined to be on the critical, that means that it, and perhaps other, will affect project .
- If average demand for an inventory item is 200 units per day, lead time is three days, and safety stock is 100 units, the reorder point is:
- If no variations in demand or lead time exist, the ROP will equal:
Expert Solution
PFA
Archived Solution
Unlocked Solution
You have full access to this solution. To save a copy with all formatting and attachments, use the button below.
Already a member? Sign In
Important Note:
This solution is from our archive and has been purchased by others. Submitting it as-is may trigger plagiarism detection. Use it for reference only.
For ready-to-submit work, please order a fresh solution below.
For ready-to-submit work, please order a fresh solution below.
Or get 100% fresh solution
Get Custom Quote