Fill This Form To Receive Instant Help

Help in Homework
trustpilot ratings
google ratings


Homework answers / question archive / Project Procurement and Risk Management Assignment (O) Complete Case 7

Project Procurement and Risk Management Assignment (O) Complete Case 7

Project Management

Project Procurement and Risk Management Assignment (O) Complete Case 7.3 Trans LAN Project in Larson and Gray by responding to questions 1, 2, and 3. Combine items 1 and 2 into a single Risk Assessment Form (see Figure 7.6 in Larson and Gray) and use Microsoft Excel to complete this item. Use Microsoft Excel for the Risk Response Matrix (see Figure 7.8 in Larson and Gray) for question 3. Note that additional items may be added to the Risk Assessment Form and the Risk Response Matrix. In addition to the requested items in the case, complete the following: Based on the risks that you identified on the Risk Assessment Form, create a Risk Severity Matrix (see Figure 7.7 in Larson and Gray). Note that additional information beyond the information shown in Figure 7.7 may be provided. Use Microsoft Excel to complete this item. Make any assumptions and document them as necessary to complete the aforementioned items. Based on the information in Appendix 12.1 in Larson and Gray, evaluate what type of contract(s) might be applicable to this project if you were to outsource certain aspects of your project to suppliers. Ensure that you justify your supplier contractual decisions based the inherent risks related to your selected contract type(s). Make any assumptions and document them accordingly. Ensure that at least 350 words are provided. APA formatting is not required. Place your responses into a Microsoft Word file. Ensure that the Risk Assessment Form, Risk Severity Matrix, and Risk Response Matrix are included in the same Microsoft Excel File. Submit your Microsoft Excel File and your Microsoft Word File. Ensure that your last name is in your file names. While APA style is not required for the body of this assignment, solid academic writing is expected, and in-text citations and references should be presented using APA documentation guidelines, which can be found in the APA Style Guide, located in the Student Success Center. This assignment uses a scoring guide Please review the scoring guide prior to beginning the assignment to become familiar with the expectations for successful completion. Case 7.3Trans LAN Project Trans Systems is a small information systems consulting firm located in Meridian, Louisiana. Trans has just been hired to design and install a local area network (LAN) for the city of Meridian’s social welfare agency. You are the manager for the project, which includes one Trans professional and two interns from a local university. You have just finished a preliminary scope statement for the project (see below). You are now brainstorming potential risks associated with the project.1. Identify potential risks associated with this project. Try to come up with at least five different risks.2. Use a risk assessment form similar to Figure 7.6 to analyze identified risks.3. Develop a risk response matrix similar to Figure 7.8 to outline how you would deal with each of the risks. PROJECT SCOPE STATEMENT PROJECT OBJECTIVE To design and install a new local area network (LAN) within one month with a budget not to exceed $90,000 for the Meridian Social Service Agency with minimum disruption to ongoing operations. DELIVERABLES? Twenty workstations and twenty laptop computers.? Server with dual-core processors.? Two color laser printers.? Windows R2 server and workstation operating system (Windows 10).? Migration of existing databases and programs to new system.? Four hours of introduction training for client’s personnel.? Sixteen hours of training for client network administrator.? Fully operational LAN system. MILESTONES 1. Hardware January 22.2. Setting users’ priority and authorization January 26.3. In-house whole network test completed February 1.4. Client site test completed February 2.5. Training completed February 16. TECHNICAL REQUIREMENTS 1. Workstations with 17-inch flat panel monitors, dual-core processors, 4 GB RAM, 8X DVD+RW, wireless card, Ethernet card, 500 GB hard drive.2. Laptops with 12-inch display monitor, dual-core processors, 2GB RAM, 8X DVD+RW, wireless card, Ethernet card, 500 GB hard drive and weigh less than 4½ lbs.3. Wireless network interface cards and Ethernet connections.4. System must support Windows 11 platforms.5. System must provide secure external access for field workers. LIMITS AND EXCLUSIONS 1. On-site work to be done after 8:00 p.m. and before 7:00 a.m. Monday through Saturday.2. System maintenance and repair only up to one month after final inspection.3. Warranties transferred to client.4. Only responsible for installing software designated by the client two weeks before the start of the project.5. Client will be billed for additional training beyond that prescribed in the contract. CUSTOMER REVIEW Director of the city of Meridian’s Social Service Agency.

Option 1

Low Cost Option
Download this past answer in few clicks

17.99 USD

PURCHASE SOLUTION

Already member?


Option 2

Custom new solution created by our subject matter experts

GET A QUOTE

Related Questions