Homework answers / question archive / 1)  What authorizes entry into the Engineering and Manufacturing Development (EMD) phase?       2)  In what document does the Program Manager (PM) address the demilitarization and disposal requirements?       3)  DoD defines and validates requirements through the Joint Capabilities Integration and Development System (JCIDS) and develops technology, produces weapons systems, and provides logistics support through the Defense Acquisition System

1)  What authorizes entry into the Engineering and Manufacturing Development (EMD) phase?       2)  In what document does the Program Manager (PM) address the demilitarization and disposal requirements?       3)  DoD defines and validates requirements through the Joint Capabilities Integration and Development System (JCIDS) and develops technology, produces weapons systems, and provides logistics support through the Defense Acquisition System

Business

1)  What authorizes entry into the Engineering and Manufacturing Development (EMD) phase?
 

 
 

2)  In what document does the Program Manager (PM) address the demilitarization and disposal requirements?
 

 
 

3)  DoD defines and validates requirements through the Joint Capabilities Integration and Development System (JCIDS) and develops technology, produces weapons systems, and provides logistics support through the Defense Acquisition System.
 

 
 

4)  What is the purpose of an Acquisition Strategy (AS)?
 

 
 

5)  What are two outputs of the Technology Maturation and Risk Reduction (TMRR) phase?
 

 
 

6)  The key activity during the Materiel Solution Analysis Phase (MSA) is to analyze promising technologies to determine which one is best suited to meet the validated requirement.
 

 
 

7)  Which is used to create the Acquisition Program Baseline (APB)?
 

 
 

8)  What is the purpose of the Milestone C decision?
 

 
 

9)  The purpose of the Technology Maturation and Risk Reduction (TMRR) phase is to reduce technology risk through competitive prototyping of critical technologies.
 

 
 

10)  Which of the following is an example of information that can be considered by the Milestone Decision Authority (MDA) at the Development Request for Proposal Release Decision (DRFPRD)?
 

 
 

 

pur-new-sol