Why Choose Us?
0% AI Guarantee
Human-written only.
24/7 Support
Anytime, anywhere.
Plagiarism Free
100% Original.
Expert Tutors
Masters & PhDs.
100% Confidential
Your privacy matters.
On-Time Delivery
Never miss a deadline.
How much work is done by each of the three forces ? The two ropes seen In the figure are used to lower a 255 kg piano 6
How much work is done by each of the three forces ?
The two ropes seen In the figure are used to lower a 255 kg piano 6.00 m from a second-story window to the ground.
Expert Solution
The horizontal forces must sum to zero:
1830N*cos60 = 1295N*cos45
915 N = 915 N √
The vertical forces must sum to zero (assuming "constant velocity"):
1830N*sin60 + 1295N*sin45 = 255kg * 9.8m/s²
2500 N = 2500 N √
The work done by gravity is 2500N * 6m = 15000 J
The work done by T1 is -1830N * sin60 * 6m = -9511.11 J
The work done by T2 is -1295N * sin45 * 6m = -5488.88 J
Total work done by the two cables is -15000 J
Archived Solution
You have full access to this solution. To save a copy with all formatting and attachments, use the button below.
For ready-to-submit work, please order a fresh solution below.





