Randburg Ltd is a manufacturing company that is about to launch a new product: Product Y

Accounting Jan 20, 2021

Randburg Ltd is a manufacturing company that is about to launch a new product: Product Y. Details of the variable costs incurred in producing one unit of Product Y are as follows: Labour R30 per hour Materials R40 per unit Variable overheads R10 per labour hour

Additional Information Product Y is produced in batches of 25 units. The first batch of 25 units is expected to take 15 labour hours. There will be 80% learning curve that will continue until 60 batches have been produced. There after learning will stop, and the average time taken for the 60th batch will be same for the remaining batches. The total output expected is 100 batches. Required: a. Calculate the time required to produce the 60th batch of Product Y [15] b. Calculate the total variable cost of the 60th batch of Product Y [10] c. Calculate the total time take to manufacture 100 batches [5] Critically discuss the three conditions that must exist in the production process of Product Y, for the learning curve effect to be realised, use valid arguments in your answer [20]   

Expert Solution

a)            
    Time taken to produce first batch 15        
    Average time taken for 2 batches 12   Percent of first batch 80% (12/15)
    Average time taken for 4 batches 9.6   Percent of average time of 2 batches 80% (9.6/12)
               
    The time taken in this case follows 80% Learning Curvre      
    The Equation will be          
    Y=a(X^b)          
    Y=Average time taken per batch          
    a=Time taken to produce the first batch= 15 hours    
    X=Cumulative bathces till learning curve is applicable= 60        
    b=Learning index          
    For 80% Learning Curve          
    b=Log0.8/Log2=-0.322          
    Y=Average time =15*(60^(-0.322))= 4.014 hours      
    Total time required for 60 batches=60*4.014                  240.81 hours      
               
    If X=59          
    Y=Average Time for 59 batches=15*(59^(-0.322))=                       4.04 Hours      
    Total Time required to produce 59 batches=59*4.04                  238.08 Hours      
  a TIME REQUIRED TO PRODUCE 60TH BATCH=240.81-238.08                       2.73 Hours      
  b Total Variable Cost of the 60th batch:          
    Direct Materials=40*25               1,000.00 RM      
    Direct Labor=30*2.73                     81.86 RM      
    Variable Overhead=10*2.73=                     27.30 RM      
    TOTAL VARIABLE COST OF 60TH BATCH               1,109.16 RM      
               
  c TIME TAKEN TO MANUFACTURE 100 BATCHES          
    Time taken for first 60 batches 240.81 Hours      
    Time taken for remaining (100-60=) 40 batches=40*2.73 109.20 Hours      
    TIME TAKEN TO MANUFACTURE 100 BATCHES=240.81+109.20                  350.01 Hours      
               
  d THREE CONDITIONS THAT MUST EXIST:          
    1. Pressure or motivation to improve          
    2.Continuity of production          
    3.Constant improvement in production process
Archived Solution
Unlocked Solution

You have full access to this solution. To save a copy with all formatting and attachments, use the button below.

Already a member? Sign In
Important Note: This solution is from our archive and has been purchased by others. Submitting it as-is may trigger plagiarism detection. Use it for reference only.

For ready-to-submit work, please order a fresh solution below.

Or get 100% fresh solution
Get Custom Quote
Secure Payment