Fill This Form To Receive Instant Help
Homework answers / question archive / SYSE 505: System Safety and Certification Module 6: Fault Models and Failure Analysis Part 3 Project: Common Cause Failure Analysis and Cause-Consequence Analysis The overall system in the figure below includes three systems: Power Supply System, System 1, and System 2
SYSE 505: System Safety and Certification
Module 6: Fault Models and Failure Analysis Part 3
Project: Common Cause Failure Analysis and Cause-Consequence Analysis
The overall system in the figure below includes three systems: Power Supply System, System 1, and System 2. System 1 and System 2 are arranged in series, and they both need the Power Supply System to operate. The internal devices of System 1 (Device 1A and Device 1B) are arranged in parallel. The internal subsystems of System 2 (Subsystem 2.1 and Subsystem 2.2) are also arranged in parallel. At the device level, Device 2A and Device 2B of Subsystem 2.1 are arranged in series, whereas Device 2C and Device 2D of Subsystem 2.2 are arranged in parallel.
|
Power Supply System |
|
|
Device 1A |
|
Device 1B |
System 1 |
|
System 2 |
|
|
Device 2C |
|
Device 2D |
Subsystem 2.2 |
|
|
Device 2A |
|
Device 2B |
Subsystem 2.1 |
In order to continue operating, the system needs the following conditions to hold:
The time study period is one year, and the individual probabilities of systems/devices being in failed states are as follows:
Answer the following questions: