Fill This Form To Receive Instant Help
Homework answers / question archive / 3
3.3 - Project: Aircraft System Hazard and Risk Analysis
Instructions
Review Chapter 7 (Integrated System Hazard Analysis) and Chapter 8 (Safety Analysis: Hazard Analysis Tasks – sections 8.1 – 8.9) of the FAA System Safety Handbook found in the Readings & Resources section of Module 3.
Select one of the diagrams depicted in Fig. 7-1, 7-2, or 7-3, and perform a hazard and risk analysis for your chosen system.
You will need to estimate the mishap risk index associated to each hazard.
Please use the FAA hazard analysis templates (Excel worksheets). Your analysis should include the following worksheets: Preliminary Hazard List, System/Subsystem Hazard Analysis and Functional Hazard Analysis.
Project Module 3 Rubric
Performed Activity |
Weight (total of 100%) |
|
Select diagram |
10% |
|
Use hazard and risk analysis worksheet |
10% |
|
Preliminary hazard list |
Hazard description |
10% |
Hazard effects |
10% |
|
Functional hazard analysis |
Hazard description and causes |
6% |
Likelihood and rationale |
6% |
|
Severity and rationale |
6% |
|
Safety recommendations |
6% |
|
Predicted residual risk and rationale |
6% |
|
System/subsystem analysis |
Hazard description and causes |
6% |
Likelihood and rationale |
6% |
|
Severity and rationale |
6% |
|
Safety recommendations |
6% |
|
Predicted residual risk and rationale |
6% |
Ratings for Each Activity |
|||
90.0 – 100.0 points |
80.0 – 89.9 points |
70.0 – 79.9 points |
0.0 – 69.9 points |
Almost all steps of the activity are performed correctly and completely |
Many steps of the activity performed; occasionally the results are not correct or complete. |
Some steps of the activity are performed; their outcome is mostly correct and complete. |
Some steps of the activity are performed; their outcome is many times incorrect and incomplete. |
Criteria |
Ratings |
Points |
|||
Select diagram |
10.0 pts Exceeds Expectations 9-10 Almost all steps of the activity are performed correctly and completely. |
8.0 pts Meets Expectations 8 Many steps of the activity performed; occasionally the results are not correct or complete. |
7.0 pts Does Not Meet Expectations 7 Some steps of the activity are performed; their outcome is mostly correct and complete. |
6.0 pts Fail 0-6 Some steps of the activity are performed; their outcome is many times incorrect and incomplete. |
10.0 |
Use hazard and risk analysis worksheet |
10.0 pts Exceeds Expectations 9-10 Almost all steps of the activity are performed correctly and completely. |
8.0 pts Meets Expectations 8 Many steps of the activity performed; occasionally the results are not correct or complete. |
7.0 pts Does Not Meet Expectations 7 Some steps of the activity are performed; their outcome is mostly correct and complete. |
6.0 pts Fail 0-6 Some steps of the activity are performed; their outcome is many times incorrect and incomplete. |
10.0 |
Preliminary hazard list: Hazard description |
10.0 pts Exceeds Expectations 9-10 Almost all steps of the activity are performed correctly and completely. |
8.0 pts Meets Expectations 8 Many steps of the activity performed; occasionally the results are not correct or complete. |
7.0 pts Does Not Meet Expectations 7 Some steps of the activity are performed; their outcome is mostly correct and complete. |
6.0 pts Fail 0-6 Some steps of the activity are performed; their outcome is many times incorrect and incomplete. |
10.0 |
Preliminary hazard list: Hazard effects |
10.0 pts Exceeds Expectations 9-10 Almost all steps of the activity are performed correctly and completely. |
8.0 pts Meets Expectations 8 Many steps of the activity performed; occasionally the results are not correct or complete. |
7.0 pts Does Not Meet Expectations 7 Some steps of the activity are performed; their outcome is mostly correct and complete. |
6.0 pts Fail 0-6 Some steps of the activity are performed; their outcome is many times incorrect and incomplete. |
10.0 |
Functional hazard analysis: Hazard description and causes |
6.0 pts Exceeds Expectations 6 Almost all steps of the activity are performed correctly and completely. |
5.0 pts Meets Expectations 5 Many steps of the activity performed; occasionally the results are not correct or complete. |
4.0 pts Does Not Meet Expectations 4 Some steps of the activity are performed; their outcome is mostly correct and complete. |
3.0 pts Fail 0-3 Some steps of the activity are performed; their outcome is many times incorrect and incomplete. |
6.0 |
Functional hazard analysis: Likelihood and rationale |
6.0 pts Exceeds Expectations 6 Almost all steps of the activity are performed correctly and completely. |
5.0 pts Meets Expectations 5 Many steps of the activity performed; occasionally the results are not correct or complete. |
4.0 pts Does Not Meet Expectations 4 Some steps of the activity are performed; their outcome is mostly correct and complete. |
3.0 pts Fail 0-3 Some steps of the activity are performed; their outcome is many times incorrect and incomplete. |
6.0 |
Functional hazard analysis: Severity and rationale |
6.0 pts Exceeds Expectations 6 Almost all steps of the activity are performed correctly and completely. |
5.0 pts Meets Expectations 5 Many steps of the activity performed; occasionally the results are not correct or complete. |
4.0 pts Does Not Meet Expectations 4 Some steps of the activity are performed; their outcome is mostly correct and complete. |
3.0 pts Fail 0-3 Some steps of the activity are performed; their outcome is many times incorrect and incomplete. |
6.0 |
Functional hazard analysis: Safety recommendations |
6.0 pts Exceeds Expectations 6 Almost all steps of the activity are performed correctly and completely. |
5.0 pts Meets Expectations 5 Many steps of the activity performed; occasionally the results are not correct or complete. |
4.0 pts Does Not Meet Expectations 4 Some steps of the activity are performed; their outcome is mostly correct and complete. |
3.0 pts Fail 0-3 Some steps of the activity are performed; their outcome is many times incorrect and incomplete. |
6.0 |
Functional hazard analysis: Predicted residual risk and rationale |
6.0 pts Exceeds Expectations 6 Almost all steps of the activity are performed correctly and completely. |
5.0 pts Meets Expectations 5 Many steps of the activity performed; occasionally the results are not correct or complete. |
4.0 pts Does Not Meet Expectations 4 Some steps of the activity are performed; their outcome is mostly correct and complete. |
3.0 pts Fail 0-3 Some steps of the activity are performed; their outcome is many times incorrect and incomplete. |
6.0 |
System/subsystem analysis: Hazard description and causes |
6.0 pts Exceeds Expectations 6 Almost all steps of the activity are performed correctly and completely. |
5.0 pts Meets Expectations 5 Many steps of the activity performed; occasionally the results are not correct or complete. |
4.0 pts Does Not Meet Expectations 4 Some steps of the activity are performed; their outcome is mostly correct and complete. |
3.0 pts Fail 0-3 Some steps of the activity are performed; their outcome is many times incorrect and incomplete. |
6.0 |
System/subsystem analysis: Likelihood and rationale |
6.0 pts Exceeds Expectations 6 Almost all steps of the activity are performed correctly and completely. |
5.0 pts Meets Expectations 5 Many steps of the activity performed; occasionally the results are not correct or complete. |
4.0 pts Does Not Meet Expectations 4 Some steps of the activity are performed; their outcome is mostly correct and complete. |
3.0 pts Fail 0-3 Some steps of the activity are performed; their outcome is many times incorrect and incomplete. |
6.0 |
System/subsystem analysis: Severity and rationale |
6.0 pts Exceeds Expectations 6 Almost all steps of the activity are performed correctly and completely. |
5.0 pts Meets Expectations 5 Many steps of the activity performed; occasionally the results are not correct or complete. |
4.0 pts Does Not Meet Expectations 4 Some steps of the activity are performed; their outcome is mostly correct and complete. |
3.0 pts Fail 0-3 Some steps of the activity are performed; their outcome is many times incorrect and incomplete. |
6.0 |
System/subsystem analysis: Safety recommendations |
6.0 pts Exceeds Expectations 6 Almost all steps of the activity are performed correctly and completely. |
5.0 pts Meets Expectations 5 Many steps of the activity performed; occasionally the results are not correct or complete. |
4.0 pts Does Not Meet Expectations 4 Some steps of the activity are performed; their outcome is mostly correct and complete. |
3.0 pts Fail 0-3 Some steps of the activity are performed; their outcome is many times incorrect and incomplete. |
6.0 |
System/subsystem analysis: Predicted residual risk and rationale |
6.0 pts Exceeds Expectations 6 Almost all steps of the activity are performed correctly and completely. |
5.0 pts Meets Expectations 5 Many steps of the activity performed; occasionally the results are not correct or complete. |
4.0 pts Does Not Meet Expectations 4 Some steps of the activity are performed; their outcome is mostly correct and complete. |
3.0 pts Fail 0-3 Some steps of the activity are performed; their outcome is many times incorrect and incomplete. |
6.0 |
Total Points: 100.0 |
Already member? Sign In