3.3 - Project: Aircraft System Hazard and Risk Analysis

Instructions

Review Chapter 7 (Integrated System Hazard Analysis) and Chapter 8 (Safety Analysis: Hazard Analysis Tasks – sections 8.1 – 8.9) of the FAA System Safety Handbook found in the Readings & Resources section of Module 3.

Select one of the diagrams depicted in Fig. 7-1, 7-2, or 7-3, and perform a hazard and risk analysis for your chosen system.

You will need to estimate the mishap risk index associated to each hazard.

Please use the FAA hazard analysis templates (Excel worksheets). Your analysis should include the following worksheets: Preliminary Hazard List, System/Subsystem Hazard Analysis and Functional Hazard Analysis
 

Project Module 3 Rubric

Performed Activity

Weight (total of 100%)

Select diagram

10%

Use hazard and risk analysis worksheet

10%

Preliminary hazard list

Hazard description

10%

Hazard effects

10%

Functional hazard analysis

Hazard description and causes

6%

Likelihood and rationale

6%

Severity and rationale

6%

Safety recommendations

6%

Predicted residual risk and rationale

6%

System/subsystem analysis

Hazard description and causes

6%

Likelihood and rationale

6%

Severity and rationale

6%

Safety recommendations

6%

Predicted residual risk and rationale

6%

 

Ratings for Each Activity

90.0 – 100.0 points

80.0 – 89.9 points

70.0 – 79.9 points

0.0 – 69.9 points

Almost all steps of the activity are performed correctly and completely

Many steps of the activity performed; occasionally the results are not correct or complete.

Some steps of the activity are performed; their outcome is mostly correct and complete.

Some steps of the activity are performed; their outcome is many times incorrect and incomplete.

 

Criteria

Ratings

Points

Select diagram

10.0 pts

Exceeds Expectations 9-10

Almost all steps of the activity are performed correctly and completely.

8.0 pts

Meets Expectations 8

Many steps of the activity performed; occasionally the results are not correct or complete.

7.0 pts

Does Not Meet Expectations 7

Some steps of the activity are performed; their outcome is mostly correct and complete.

6.0 pts

Fail 0-6

Some steps of the activity are performed; their outcome is many times incorrect and incomplete.

10.0

Use hazard and risk analysis worksheet

10.0 pts

Exceeds Expectations 9-10

Almost all steps of the activity are performed correctly and completely.

8.0 pts

Meets Expectations 8

Many steps of the activity performed; occasionally the results are not correct or complete.

7.0 pts

Does Not Meet Expectations 7

Some steps of the activity are performed; their outcome is mostly correct and complete.

6.0 pts

Fail 0-6

Some steps of the activity are performed; their outcome is many times incorrect and incomplete.

10.0

Preliminary hazard list: Hazard description

10.0 pts

Exceeds Expectations 9-10

Almost all steps of the activity are performed correctly and completely.

8.0 pts

Meets Expectations 8

Many steps of the activity performed; occasionally the results are not correct or complete.

7.0 pts

Does Not Meet Expectations 7

Some steps of the activity are performed; their outcome is mostly correct and complete.

6.0 pts

Fail 0-6

Some steps of the activity are performed; their outcome is many times incorrect and incomplete.

10.0

Preliminary hazard list: Hazard effects

10.0 pts

Exceeds Expectations 9-10

Almost all steps of the activity are performed correctly and completely.

8.0 pts

Meets Expectations 8

Many steps of the activity performed; occasionally the results are not correct or complete.

7.0 pts

Does Not Meet Expectations 7

Some steps of the activity are performed; their outcome is mostly correct and complete.

6.0 pts

Fail 0-6

Some steps of the activity are performed; their outcome is many times incorrect and incomplete.

10.0

Functional hazard analysis: Hazard description and causes

6.0 pts

Exceeds Expectations 6

Almost all steps of the activity are performed correctly and completely.

5.0 pts

Meets Expectations 5

Many steps of the activity performed; occasionally the results are not correct or complete.

4.0 pts

Does Not Meet Expectations 4

Some steps of the activity are performed; their outcome is mostly correct and complete.

3.0 pts

Fail 0-3

Some steps of the activity are performed; their outcome is many times incorrect and incomplete.

6.0

Functional hazard analysis: Likelihood and rationale

6.0 pts

Exceeds Expectations 6

Almost all steps of the activity are performed correctly and completely.

5.0 pts

Meets Expectations 5

Many steps of the activity performed; occasionally the results are not correct or complete.

4.0 pts

Does Not Meet Expectations 4

Some steps of the activity are performed; their outcome is mostly correct and complete.

3.0 pts

Fail 0-3

Some steps of the activity are performed; their outcome is many times incorrect and incomplete.

6.0

Functional hazard analysis: Severity and rationale

6.0 pts

Exceeds Expectations 6

Almost all steps of the activity are performed correctly and completely.

5.0 pts

Meets Expectations 5

Many steps of the activity performed; occasionally the results are not correct or complete.

4.0 pts

Does Not Meet Expectations 4

Some steps of the activity are performed; their outcome is mostly correct and complete.

3.0 pts

Fail 0-3

Some steps of the activity are performed; their outcome is many times incorrect and incomplete.

6.0

Functional hazard analysis: Safety recommendations

6.0 pts

Exceeds Expectations 6

Almost all steps of the activity are performed correctly and completely.

5.0 pts

Meets Expectations 5

Many steps of the activity performed; occasionally the results are not correct or complete.

4.0 pts

Does Not Meet Expectations 4

Some steps of the activity are performed; their outcome is mostly correct and complete.

3.0 pts

Fail 0-3

Some steps of the activity are performed; their outcome is many times incorrect and incomplete.

6.0

Functional hazard analysis: Predicted residual risk and rationale

6.0 pts

Exceeds Expectations 6

Almost all steps of the activity are performed correctly and completely.

5.0 pts

Meets Expectations 5

Many steps of the activity performed; occasionally the results are not correct or complete.

4.0 pts

Does Not Meet Expectations 4

Some steps of the activity are performed; their outcome is mostly correct and complete.

3.0 pts

Fail 0-3

Some steps of the activity are performed; their outcome is many times incorrect and incomplete.

6.0

System/subsystem analysis: Hazard description and causes

6.0 pts

Exceeds Expectations 6

Almost all steps of the activity are performed correctly and completely.

5.0 pts

Meets Expectations 5

Many steps of the activity performed; occasionally the results are not correct or complete.

4.0 pts

Does Not Meet Expectations 4

Some steps of the activity are performed; their outcome is mostly correct and complete.

3.0 pts

Fail 0-3

Some steps of the activity are performed; their outcome is many times incorrect and incomplete.

6.0

System/subsystem analysis: Likelihood and rationale

6.0 pts

Exceeds Expectations 6

Almost all steps of the activity are performed correctly and completely.

5.0 pts

Meets Expectations 5

Many steps of the activity performed; occasionally the results are not correct or complete.

4.0 pts

Does Not Meet Expectations 4

Some steps of the activity are performed; their outcome is mostly correct and complete.

3.0 pts

Fail 0-3

Some steps of the activity are performed; their outcome is many times incorrect and incomplete.

6.0

System/subsystem analysis: Severity and rationale

6.0 pts

Exceeds Expectations 6

Almost all steps of the activity are performed correctly and completely.

5.0 pts

Meets Expectations 5

Many steps of the activity performed; occasionally the results are not correct or complete.

4.0 pts

Does Not Meet Expectations 4

Some steps of the activity are performed; their outcome is mostly correct and complete.

3.0 pts

Fail 0-3

Some steps of the activity are performed; their outcome is many times incorrect and incomplete.

6.0

System/subsystem analysis: Safety recommendations

6.0 pts

Exceeds Expectations 6

Almost all steps of the activity are performed correctly and completely.

5.0 pts

Meets Expectations 5

Many steps of the activity performed; occasionally the results are not correct or complete.

4.0 pts

Does Not Meet Expectations 4

Some steps of the activity are performed; their outcome is mostly correct and complete.

3.0 pts

Fail 0-3

Some steps of the activity are performed; their outcome is many times incorrect and incomplete.

6.0

System/subsystem analysis: Predicted residual risk and rationale

6.0 pts

Exceeds Expectations 6

Almost all steps of the activity are performed correctly and completely.

5.0 pts

Meets Expectations 5

Many steps of the activity performed; occasionally the results are not correct or complete.

4.0 pts

Does Not Meet Expectations 4

Some steps of the activity are performed; their outcome is mostly correct and complete.

3.0 pts

Fail 0-3

Some steps of the activity are performed; their outcome is many times incorrect and incomplete.

6.0

Total Points: 100.0

 

 

Option 1

Low Cost Option
Download this past answer in few clicks

33.99 USD

PURCHASE SOLUTION

Already member?


Option 2

Custom new solution created by our subject matter experts

GET A QUOTE