Fill This Form To Receive Instant Help

Help in Homework
trustpilot ratings
google ratings


Homework answers / question archive / 6-1 Capstone Element 6: MIS 490 Final Project With New Data Set Instructions Using MS Power BI, develop an analysis and visualization of an additional data set

6-1 Capstone Element 6: MIS 490 Final Project With New Data Set Instructions Using MS Power BI, develop an analysis and visualization of an additional data set

Statistics

6-1 Capstone Element 6: MIS 490 Final Project With New Data Set
Instructions
Using MS Power BI, develop an analysis and visualization of an additional data set. Indicate whether it can be
related to your current project. If the data can be related, provide a new visualization and report on the
insights that were gained in this new addition. If the data cannot be related, provide a separate visualization
and report explaining the insights of this data and why it cannot be related.
You are required to submit your work. You will receive points for submission as well as feedback from your
instructor. Be aware that you may not receive feedback on this assignment prior to submission of your final
project in the next module. If you are concerned about this submission and need feedback, reach out to your
instructor with your questions before you submit your final project.
To complete this assignment, review the following:
Capstone Scenario One
Updated Data Sets
 

Option 1

Low Cost Option
Download this past answer in few clicks

13.99 USD

PURCHASE SOLUTION

Already member?


Option 2

Custom new solution created by our subject matter experts

GET A QUOTE