Trusted by Students Everywhere
Why Choose Us?
0% AI Guarantee

Human-written only.

24/7 Support

Anytime, anywhere.

Plagiarism Free

100% Original.

Expert Tutors

Masters & PhDs.

100% Confidential

Your privacy matters.

On-Time Delivery

Never miss a deadline.

Case Study 1   Ms

Accounting Nov 15, 2021

Case Study 1

 

Ms. Muna is an owner of textile manufacturing business. She needs the raw material on regular basis. Therefore, in order to maintain effective control in the purchase and consumption of material, she decided to uses different material control techniques such as, determination of various levels of materials, EOQ, and ABC analysis. Ms. Muna used additional technique but she found it not useful since the supplier was not able to deliver the material before its used timing. Cost accountant at the factory reported the following data: The normal usage was 200 units per week. In case of low demand, the minimum usage was 100 units. During high demand time Ms. Muna used to purchase 300 units. She required two types of raw material, Material X and Material Y. The normal quantity demanded is 150 units per week and average consumption is 50 units. Ms. Muna calculated the lead time to get material in respect to emergency as 1 week for material X and 2 weeks for material Y. Ms. Muna instructed the warehouse manager that he should place reorder from 2 to 3 weeks & 3 to 4 weeks for material X and Y respectively. The cost of placing a material order is 40 OMR. The annual carrying cost is 10 percent of inventory cost, and the cost per unit is 20 OMR.

 

Based on the case given, the maximum use and minimum use of material X, total would be?

 

a.

300

 

b.

400

 

c.

100

 

d.

1,470

 

Based on the case, how many weeks Ms. Muna needs to wait to get Material Y, during emergency time?

 

a.

2 weeks

 

b.

1 week

 

c.

3 weeks

 

d.

4 weeks

Expert Solution

For detailed step-by-step solution, place custom order now.
Need this Answer?

This solution is not in the archive yet. Hire an expert to solve it for you.

Get a Quote
Secure Payment