University of California, Los Angeles RQMCMB 2 Quiz 7 1)The multiplication process used by MRP to determine lower level requirements is called: The need for safety stocks can be reduced by an operations strategy which: The optimum level of inspection is where the: The output of MRP is: The probability of concluding that assignable variation exists when only random variation is present is:(I) the probability of a Type I error(II) known as the alpha risk(III) highly unlikely (IV) the sum of probabilities in the two tails of the normal distribution The process capability index (Cpk) may mislead if:(I) the process is not stable
University of California, Los Angeles
RQMCMB 2
Quiz 7
1)The multiplication process used by MRP to determine lower level requirements is called:
- The need for safety stocks can be reduced by an operations strategy which:
- The optimum level of inspection is where the:
- The output of MRP is:
- The probability of concluding that assignable variation exists when only random variation is present is:(I) the probability of a Type I error(II) known as the alpha risk(III) highly unlikely
(IV) the sum of probabilities in the two tails of the normal distribution
- The process capability index (Cpk) may mislead if:(I) the process is not stable.(II) the process output is not normally distributed.(III) the process is not centered.
- The project management strategy of injecting additional resources in order to reduce the length of the project is called:
- The purpose of "cycle counting" is to:
- The purpose of control charts is to:
- The range chart (Rchart) is most likely to detect a change in:
- There are four activities on the critical path, and they have standard deviations of 1, 2, 4, and 2 days. The standard deviation of the critical path is:
- There are four activities on the critical path. Coincidentally, their standard deviations are all equal to 4. The standard deviation of the critical path is therefore equal to:
- To an activity means to shorten the time it will take.
- Uncommitted inventory is called
- Under lotforlot, order sizes for component parts are essentially determined directly from which one of the following?
- variation is a variation whose cause can be identified.
Expert Solution
PFA
Archived Solution
Unlocked Solution
You have full access to this solution. To save a copy with all formatting and attachments, use the button below.
Already a member? Sign In
Important Note:
This solution is from our archive and has been purchased by others. Submitting it as-is may trigger plagiarism detection. Use it for reference only.
For ready-to-submit work, please order a fresh solution below.
For ready-to-submit work, please order a fresh solution below.
Or get 100% fresh solution
Get Custom Quote