Spin Cycle Architecture uses three activity pools to apply overhead to its projects. Each activity has a cost driver used to allocate the overhead costs to the projects. The activities and related overhead costs are as follows: initial concept formation $47,760; design $286,000; and construction oversight $121,900. The cost drivers and estimated use are as follows.
Activities |
Cost Drivers |
Estimated Use of Cost |
||
Initial concept formation | Number of project changes | 24 | ||
Design | Square feet | 143,000 | ||
Construction oversight | Number of months | 115 |
(a) Compute the predetermined overhead rate for each activity.
(b) Classify each of these activities as unit-level, batch-level, product-level, or facility-level.
(a)
Initial concept formation |
$47,760
|
= | $1,990 per project change | |
24
|
||||
Design |
$286,000
|
= | $2 per square foot | |
143,000
|
||||
Construction oversight |
$121,900
|
= | $1,060 per month | |
115
|
(a) Compute the predetermined overhead rate for each activity.
Overhead Rate |
|||
Initial concept formation | $
|
per project change | |
Design | $
|
per square foot | |
Construction oversight | $
|
Per month |
(b) Classify each of these activities as unit-level, batch-level, product-level, or facility-level.
Activities |
Level |
|
Initial concept formation |
|
|
Design |
|
|
Construction oversight |
|