1) What authorizes entry into the Engineering and Manufacturing Development (EMD) phase?
|
| |
| |
|
|
2) In what document does the Program Manager (PM) address the demilitarization and disposal requirements?
|
| |
| |
|
|
3) DoD defines and validates requirements through the Joint Capabilities Integration and Development System (JCIDS) and develops technology, produces weapons systems, and provides logistics support through the Defense Acquisition System.
|
| |
| |
|
|
4) What is the purpose of an Acquisition Strategy (AS)?
|
| |
| |
|
|
5) What are two outputs of the Technology Maturation and Risk Reduction (TMRR) phase?
|
| |
| |
|
|
6) The key activity during the Materiel Solution Analysis Phase (MSA) is to analyze promising technologies to determine which one is best suited to meet the validated requirement.
|
| |
| |
|
|
7) Which is used to create the Acquisition Program Baseline (APB)?
|
| |
| |
|
|
8) What is the purpose of the Milestone C decision?
|
| |
| |
|
|
9) The purpose of the Technology Maturation and Risk Reduction (TMRR) phase is to reduce technology risk through competitive prototyping of critical technologies.
|
| |
| |
|
|
10) Which of the following is an example of information that can be considered by the Milestone Decision Authority (MDA) at the Development Request for Proposal Release Decision (DRFPRD)?
|
| |
| |
|