1) DoD defines and validates requirements through the Joint Capabilities Integration and Development System (JCIDS) and develops technology, produces weapons systems, and provides logistics support through the Defense Acquisition System

Business

1) DoD defines and validates requirements through the Joint Capabilities Integration and Development System (JCIDS) and develops technology, produces weapons systems, and provides logistics support through the Defense Acquisition System.

 

2) What is the primary purpose of the Materiel Solution Analysis (MSA) phase?    

 


 

3) What is the purpose of an Acquisition Strategy (AS)?   

 


 

4) Before a project enters the TMRR phase, the AoA must be complete and the Acquisition Strategy (AS) is approved by the MDA.   

 


 

5) When is the Acquisition Program baseline (APB) prepared?   ]

 


 

6) What authorizes entry into the Engineering and Manufacturing Development (EMD) phase?   

 

 


 

7) What is the purpose of the Milestone C decision?    

 

 


 

8) The Operations and Support Phase begins after the production or deployment decision and is based on which Milestone Decision Authority (MDA) approved document

 


 

 

9) What is the agreement between the Milestone Decision Authority (MDA) and Program Manager (PM) that will be used for tracking and reporting for the life of a program?   


 
 

10) What is the purpose of the Engineering and Manufacturing Development (EMD) phase?   

 

 

 

11) Which of the following Joint Capabilities Integration and Development System (JCIDS) documents interfaces with the Defense Acquisition System?


 
   
 

12) What is the primary purpose of the Materiel Solution Analysis (MSA) phase?  

 

 


 

13) In order for the Program Manager to maximize affordability from program initiation through post-production, the Acquisition Strategy must evolve and become increasingly more definitive

 


 

14) What are two outputs of the Technology Maturation and Risk Reduction (TMRR) phase?  

 

 


 

15) Which is used to create the Acquisition Program Baseline (APB)?    

 


 

16) What authorizes entry into the Engineering and Manufacturing Development (EMD) phase?   

 


 

17) What authorizes entry into the Production and Deployment phase  

 


 

18) In what document does the Program Manager (PM) address the demilitarization and disposal requirements?    

 

 

 

19) The Initial Capabilities Document (ICD) becomes the basis for which of the following phases

 

Option 1

Low Cost Option
Download this past answer in few clicks

5.83 USD

PURCHASE SOLUTION

Already member?


Option 2

Custom new solution created by our subject matter experts

GET A QUOTE