Homework answers / question archive / 1) DoD defines and validates requirements through the Joint Capabilities Integration and Development System (JCIDS) and develops technology, produces weapons systems, and provides logistics support through the Defense Acquisition System
1) DoD defines and validates requirements through the Joint Capabilities Integration and Development System (JCIDS) and develops technology, produces weapons systems, and provides logistics support through the Defense Acquisition System.
|
3) What is the purpose of an Acquisition Strategy (AS)? |
4) Before a project enters the TMRR phase, the AoA must be complete and the Acquisition Strategy (AS) is approved by the MDA. |
5) When is the Acquisition Program baseline (APB) prepared? ] |
6) What authorizes entry into the Engineering and Manufacturing Development (EMD) phase? |
7) What is the purpose of the Milestone C decision? |
8) The Operations and Support Phase begins after the production or deployment decision and is based on which Milestone Decision Authority (MDA) approved document |
|
|||
|
|||
|
|
|||
|
|||
|
13) In order for the Program Manager to maximize affordability from program initiation through post-production, the Acquisition Strategy must evolve and become increasingly more definitive |
14) What are two outputs of the Technology Maturation and Risk Reduction (TMRR) phase? |
15) Which is used to create the Acquisition Program Baseline (APB)? |
16) What authorizes entry into the Engineering and Manufacturing Development (EMD) phase? |
17) What authorizes entry into the Production and Deployment phase |
18) In what document does the Program Manager (PM) address the demilitarization and disposal requirements? |
|