Homework answers / question archive / When reducing project duration, the duration for a project that is optimal is at the point where Direct costs equal indirect costs
When reducing project duration, the duration for a project that is optimal is at the point where
Direct costs equal indirect costs. |
||
Indirect costs are the lowest. |
||
Direct costs are the lowest. |
||
Total project costs are the lowest. |
||
The project changes from time-constrained to resource-constrained. |