Why Choose Us?
0% AI Guarantee
Human-written only.
24/7 Support
Anytime, anywhere.
Plagiarism Free
100% Original.
Expert Tutors
Masters & PhDs.
100% Confidential
Your privacy matters.
On-Time Delivery
Never miss a deadline.
A chair manufacturer hires its assembly-line labor for $30 an hour and calculates the rental cost of its machinery is $15 per hour
A chair manufacturer hires its assembly-line labor for $30 an hour and calculates the rental cost of its machinery is $15 per hour. Suppose that a chair can be produced using 4 hours of labor or machinery in any combination. If the firm is currently using 3 hours of labor for each hour of machine time, is it minimizing its costs of production? If so, why? If not, how can it improve the situation?
Expert Solution
Since labor and machine could be combined in any way to produce the same amount of chair, they are perfect substitutes in the production process. In this case, it is cost effective to use whichever input that is cheaper (with a hourly rate). Since each labor cost $30 per hour and machinery costs $15 per hour, it is therefore optimal to use all machines and no labor.
The current combination is not minimizing costs. Current total cost = 3*30 + 15 = $105. If the manufacturer instead uses only machinery, and it would need 4 hours of machinery to produce 1 chair, but the cost is 4*10 = $40, which is lower than the current cost.
Archived Solution
You have full access to this solution. To save a copy with all formatting and attachments, use the button below.
For ready-to-submit work, please order a fresh solution below.





